🇫🇷 Version française · 🇪🇸 Español

🎃 Halloween special: play the Halloween quiz →

Quality & Continuous Improvement Quiz

Quality & Continuous Improvement Quiz: Sorting and removing what is unnecessary

Free quality quiz: ISO 9001, PDCA, 5S, Lean, kaizen, FMEA, 8D, control charts, plus real-life scenarios to think about. Every answer is explained.

Start this quiz →

🖨️ Printable version (20 questions + answers)

🎯 Test yourself in 5 questions

Question 1/5

What does the Japanese word “kaizen” mean?

Written by a QHSE director with more than 25 years of industrial experience, this quiz reviews the tools and reflexes of quality: ISO 9001, PDCA, 5S, Ishikawa, Pareto, Lean, kaizen, just-in-time, FMEA, 8D and statistical process control. Real-life scenarios also get you thinking: an indicator in the green while customers complain, a defect that keeps coming back, a procedure nobody follows… For quality professionals, managers and anyone who wants to work better together.

Did you know?

This quiz currently has 41 questions, ranging from easy to hard, available in French, English and Spanish when the Spanish translation is available.

Quality & Continuous Improvement quiz: trivia questions and answers

Warm up before the quiz with these 8 trivia questions and their explained answers: click a question to reveal the answer.

Easy questions

In Deming's ‘PDCA’ cycle, what does the C stand for?

Answer: Check: verifying the results. Plan, Do, Check, Act (adjust and standardise). The wheel turns endlessly: it is the engine of continuous improvement, at the heart of every ISO management standard.

At Toyota, what can any operator who spots a defect on the production line do?

Answer: Stop the whole line. By pulling the ‘andon’ cord, the operator stops the line and alerts the team. Stopping is costly at the time, but far less than delivering thousands of faulty cars: quality is built in at the source.

What does the Japanese word “kaizen” mean?

Answer: Continuous improvement, in small steps, involving everyone. Kaizen combines “change” and “good”. The idea: many small improvements suggested by those who do the work are better than one rare big reform, and they cost little.

In Lean, from whose point of view is “value added” defined?

Answer: The customer's. An operation adds value if the customer would be willing to pay for it: machining, assembling, painting. Moving, waiting, recounting or storing add nothing for them, even if they are sometimes necessary.

Hard questions

In the Japanese 5S method, what does the first S, ‘Seiri’, require?

Answer: Sorting and removing what is unnecessary. Seiri (sort), Seiton (set in order), Seiso (shine), Seiketsu (standardise), Shitsuke (sustain). You start by throwing things out: there is no point neatly storing what is useless.

What is the difference between drawing tolerances and control-chart limits?

Answer: Tolerances come from customer needs; control limits come from how the process actually behaves. Confusing the two is a classic mistake. A process can be stable but incapable (it varies little, yet still falls outside tolerance), or capable but unstable. The two issues are handled differently.

What is the aim of the SMED method?

Answer: Drastically reducing changeover time. Developed by Shigeo Shingo, the method aims for tool changes in under ten minutes by preparing in advance everything that can be done while the machine is running. Quick changeovers make it possible to produce in small batches without large stocks.

The same defect keeps coming back despite three successive corrective actions. What should you suspect first?

Answer: That the real root cause has not been found. Actions that do not last often treat a symptom. Go back to the facts, check that the assumed cause really reproduces the defect, and that removing it makes the defect disappear: that proof is what is most often missing.

33 more questions are waiting for you in the quiz!

Play now →

← Back to all quizzes